Report Analysis & Pricing
Phase 1 report analysis dashboard
A premium Sewer Swarm product shell for upload intake, parser routing, canonical extraction review, scoring, recommendations, treatment, pricing, approvals, and stored client/site history.
Report jobs in the Phase 1 workflow shell
PDF and DB3 intake records this week
Confidence, framework, or pricing checks
Approved output history records
Operational results grid
Phase 1 mock rows only. Parser, scoring, recommendations, pricing, database persistence, and AI logic remain stubbed.
| Item Number | Inspection Number | Pipe Size | Material | Use | Upstream Manhole | Upstream Manhole Depth | Downstream Manhole | Downstream Manhole Depth | Total Length Surveyed | Surveyed Length | Observations | SRM Score | Service Score | Recommendations | Adoptable | Pass/Fail | Cost to Complete Recommendations |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| SW-2026-001 | 150 mm | Vitrified clay | Foul | MH01 | 1.42 m | MH02 | 1.68 m | 42.0 m | 42.0 m |
| 1 | 1 | No immediate works; retain junction trace for records. | Adoptable | Pass | GBP 0Priced | |
Full observations
Source traceSource trace placeholder: PDF page 4 / DB3 row 118. Recommendation rationaleRecommendation rationale placeholder: low service impact and no urgent structural action. Pricing assumptionsPricing assumptions placeholder: no chargeable remedial activity selected. | |||||||||||||||||
| SW-2026-001 | 150 mm | Vitrified clay | Foul | MH01 | 1.42 m | MH02 | 1.68 m | 42.0 m | 42.0 m |
| 2 | 1 | Monitor during next maintenance cycle. | Adoptable | Pass | Placeholder GBP 350Placeholder | |
| SW-2026-002 | 225 mm | Concrete | Surface water | MH03 | 2.10 m | MH04 | 2.34 m | 61.5 m | 48.0 m |
| 5 | 5 | Excavate and repair displaced joint before adoption. | Not Adoptable | Fail | GBP 4,850Priced | |
| SW-2026-003 | 150 mm | PVC | Foul | IC05 | 0.86 m | MH06 | 1.21 m | 28.0 m | 28.0 m |
| Pending | 3 | Review maintenance threshold and confirm cleaning scope. | Review Required | Review Required | Pricing config required | |
| SW-2026-004 | 300 mm | Brick | Combined | MH07 | 2.74 m | MH08 | 2.92 m | 112.0 m | 112.0 m |
| 2 | 4 | High-pressure jetting and post-clean verification survey. | Review Required | Fail | Placeholder GBP 1,250Placeholder | |
Recent report jobs
Placeholder report history showing the intended client/site workflow spine.
| Report | Client | Site | Status | Confidence |
|---|---|---|---|---|
| SS-RA-1007 | Thames Water framework | North Pumping Station | Review Required | Overall78% |
| SS-RA-1006 | Domestic/private baseline | Oak Lane Development | Pricing Ready | Overall84% |
| SS-RA-1005 | Highways baseline | A43 Culvert Run | Output Generated | Overall91% |
Quick actions
Phase 1 workflow entry points.
Canonical contract v1 shell
Pair validation shell
Items waiting for approval
Recent clients
Client-aware history shell.
Recent sites
Site remains the primary anchor.